Question 102 - MB-335 discussion
A co uses the asset management module in Supply Cham Management. The company has four conveyer systems in the warehouse. A robotic crane moves pallets of products to its conveyer int. Each robotic crane and conveyer line is considered a multilevel asset.
A work order arrives for a conveyer system. A technician completing the work observes that the robotic crane needs a repair. The technician is not qualified to work on the robotic crane.
You need to ensure that the robotic is repaired.
Which two options should you configure? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
Calculate capacity load with the level field set to 0.
Create a related work order.
Update the work order Lifecycle state.
Create a manual work order.
Calculate capacity load with the level field set to 1.