A VCF architect collected the following requirements when designing the expansion of a new VI Workload Domain with twenty four vSAN Ready nodes, each with a dual-port 25Gbps network interface card:

* Provide scalable high-performance networking with layer-3 termination at top-of-rack

* Protect workloads from switch/NIC/rack failure

* Provide isolation for DMZ workloads

* Provide at-least 25Gbps dedicated bandwidth to backup traffic

* Easily accept workloads on traditional VLAN-backed networks

* Fully-supported by VMware

Which three design considerations meet all of these requirements? (Choose three.)

A.
Two-node Edge Cluster with ECMP
Answers
A.
Two-node Edge Cluster with ECMP
B.
Spine and Leaf network topology with layer-3 at Spine
Answers
B.
Spine and Leaf network topology with layer-3 at Spine
C.
Stretched Clustering
Answers
C.
Stretched Clustering
D.
Spine and Leaf network topology with layer-3 at top of rack
Answers
D.
Spine and Leaf network topology with layer-3 at top of rack
E.
Two-node Edge Cluster with BFD
Answers
E.
Two-node Edge Cluster with BFD
F.
Core Aggregation network topology
Answers
F.
Core Aggregation network topology
Suggested answer: A, D, E