A customer is leveraging vRA to provision workloads to a consolidated VCF domain cluster. Due to the increased demand of customer workloads, more capacity is now needed. The architect provides information on scaling the customer's consolidated design.

Which statement accurately characterizes this design?

A.
Migrating to a standard design will require redeploying the infrastructure from scratch.
Answers
A.
Migrating to a standard design will require redeploying the infrastructure from scratch.
B.
Migrating to a standard design should be considered after reaching 8 or 10 nodes in the consolidated design.
Answers
B.
Migrating to a standard design should be considered after reaching 8 or 10 nodes in the consolidated design.
C.
A VMware GSS team must be involved during the process of migrating to a consolidated design.
Answers
C.
A VMware GSS team must be involved during the process of migrating to a consolidated design.
D.
A consolidated design will not support the addition of multiple clusters.
Answers
D.
A consolidated design will not support the addition of multiple clusters.
Suggested answer: B

Explanation:

'When more capacity is needed, scaling the consolidated design is an option but a much better design option for a larger scale is to use workload domains. After you reach 8 or 10 nodes in the consolidated design, consider migrating to a standard design. If you migrate to a standard design, the default small vCenter Server Appliance size should be enough for most designs.'

According to the VMware Cloud Foundation documentation1, a consolidated architecture is suitable for smaller deployments that have 6 or fewer nodes, while a standard architecture is recommended for larger deployments that have more than 6 nodes. A consolidated architecture has some limitations and trade-offs compared to a standard architecture, such as less scalability, flexibility, and isolation. Therefore, if the customer's workload demand increases and requires more capacity, migrating to a standard architecture should be considered.