List of questions
Related questions
Question 700 - 200-301 discussion
Refer to the exhibit.
An engineer is configuring a new Cisco switch NewSW, to replace SW2 The details have been provided
• Switches SW1 and SW2 are third-party devices without support for trunk ports
• The existing connections must be maintained between PC1 PC2 and PC3
• Allow the switch to pass traffic from future VLAN 10. Which configuration must be applied?
A.
B.
C.
D.
Your answer:
0 comments
Sorted by
Leave a comment first