Refer to the exhibit

Refer to the exhibit Cisco SD-WAN is deployed with controllers hosted in a data center All branches have WAN Edge devices with dual connections to the data center one via Internet and the other using MPLS Three branches out of 20 have issues with their control connections on MPLS circuit The local error refers to Control Connection Failure Which action resolves the issue*?

A.

Rectify any issues with the underlay routing configuration

Answers
A.

Rectify any issues with the underlay routing configuration

B.

Match the TLOC color on the controllers and all WAN Edge devices

Answers
B.

Match the TLOC color on the controllers and all WAN Edge devices

C.

Match certificates for the DTLS connection and Root CA must be installed first on WAN Edge devices

Answers
C.

Match certificates for the DTLS connection and Root CA must be installed first on WAN Edge devices

D.

Update the system IP on vManage and then resend it to the controllers

Answers
D.

Update the system IP on vManage and then resend it to the controllers

Suggested answer: A