ExamGecko
Question list
Search
Search

Question 340 - 300-415 discussion

Report
Export

A company deploys a Cisco SD-WAN solution but has an unstable Internet connection. When the link to vSmart comes back up, the WAN Edge router routing table is not refreshed, and some traffic to the destination network is dropped. The headquarters is the hub site, and it continuously adds new sites to the SD-WAN network. An engineer must configure route refresh between WAN Edge and vSmart within 2 minutes. Which configuration meets this requirement?

A.

Option A

Answers
A.

Option A

B.

Option B

Answers
B.

Option B

C.

Option C

Answers
C.

Option C

D.

Option D

Answers
D.

Option D

Suggested answer: A
asked 07/10/2024
Maxim Shpakov
41 questions
User
Your answer:
0 comments
Sorted by

Leave a comment first