Refer to the exhibit.

Refer to the exhibit. An engineering team implemented IS-IS on the network, with several different areas. Recently, router R6 in area 3 has been experiencing excessive CPU usage. To reduce the load, a network engineer implemented route summarization on R2 However. R6 is still receiving the full routes from all routers. Which action must the engineer take to resolve the excessive CPU usage?

A.

Configure routers R3 and R5 to send summary routes to R6.

Answers
A.

Configure routers R3 and R5 to send summary routes to R6.

B.

Configure the Level 2 router R6 to manage summarization for the network

Answers
B.

Configure the Level 2 router R6 to manage summarization for the network

C.

Configure router R1 to send only the default route to R2 and R4.

Answers
C.

Configure router R1 to send only the default route to R2 and R4.

D.

Configure all routers as Level 1/2 routers so that route summarization functions throughout the network

Answers
D.

Configure all routers as Level 1/2 routers so that route summarization functions throughout the network

Suggested answer: A