List of questions
Related questions
Question 141 - 300-620 discussion
A network engineer configures the Cisco ACI fabric to connect to vCenter with these requirements:
Port groups must be automatically created on the distributed virtual switch.
Port groups must use the VLAN allocation in the range between 20-30.
The deployment must optimize the CAM space on the leaf switches.
Which set of actions meets these criteria?
Create a dynamic VLAN pool with the VLAN range of 20-30.
Create a VMM domain and associate it with the VLAN pool.
Create the EPG and associate the domain.
Set the deployment immediacy to On Demand.
Create a dynamic VLAN pool with the VLAN range of 20-30.
Create a physical domain and associate it with the VLAN pool.
Create the EPG and associate the domain.
Set the deployment immediacy to On Demand.
Create a static VLAN pool with the VLAN range of 20-30.
Create a physical domain and associate it with the VLAN pool.
Create the EPG and associate the domain.
Set the deployment immediacy to Immediate.
Create a static VLAN pool with the VLAN range of 20-30.
Create a VMM domain and associate it with the VLAN pool.
Create the EPG and associate the domain.
Set the deployment immediacy to Immediate.
0 comments
Leave a comment first