An engineer is implementing NPV mode on a Cisco MDS 9000 Series Switch. Which action must be taken?
A.
The FCNS database must be disabled in the fabric.
B.
A port channel must be configured to the upstream switch.
C.
All switches in the fabric must be Cisco MDS switches.
D.
NPIV must be enabled on the upstream switch.