List of questions
Related questions
Question 354 - 350-601 discussion
Refer to the exhibit.
Refer to the exhibit. The MDS-EDGE-Switch and MDS-Core-Switch are configured with NPV and NPIV features The FLOGI from Cisco UCS is received by the MDS-Core-Switch on interface fc1/2. An engineer tried to move all traffic between the MDS-EDGE-Switch and MOS-Core-Switch from interface fc 1/2 to fc1/3, but the attempt failed. Which set of actions completes the configuration?
A.
Option A
B.
Option B
C.
Option C
D.
Option D
Your answer:
0 comments
Sorted by
Leave a comment first