Question 482 - 350-601 discussion
An engineer must Configure a new Cisco UCS B-Series infrastructure with a Cisco 5108 chassis. The configuration must meet these requirements:
* The setup must use aggregation between Cisco UCS Fabric Interconnects and I/O modules.
* The implementation requires four 10 GbE connections per I/O module.
* The Cisco UCS Fabric Interconnects must support uplinks of different speeds for future expansion.
Which two steps must be taken to meet these requirements? (Choose two.)
Reacknowledge the chassis after the initial discovery.
Set IOM link pinning in Global Policies.
Configure unified ports for the chassis.
Set Link Group Preference to Port Channel.
Disable Auto Configure Server Port.