An installation engineer is installing the power connections to the ACP 4200.
What must the installation engineer be aware of?
A.
Before connecting the power, the power switches of all components in the rack must be in the OFF position.
B.
Power cables must only access the rack from the top of the rack.
C.
Power connections must be within 10 feet (3 meters) of the rack.
D.
Power cables must only access the rack from the bottom of the rack.