Select the period of a Huawei Oceanstor 9000 cluster, and use the back-end 10GE network, then the network connection is completed to the 10GE switch.

Which configuration are as follows? (multiple choice)

A.
Configure two switches to stack
Answers
A.
Configure two switches to stack
B.
Configure the switch flow control switch
Answers
B.
Configure the switch flow control switch
C.
Configure switch management IP
Answers
C.
Configure switch management IP
Suggested answer: A, B, C