Single choice Which of the following is the correct power-on sequence of the Huawei Oceanstor 9000 big data storage system?
A.
Cabinet> Switch>) KM> Node
B.
cabinet->KM->switch>node
C.
Cabinet>Switch>Node>KVM
D.
Cabinet>Node>KM->Switch
Your answer: