Which of the following MOST effectively minimizes downtime during system conversions?

A.
Phased approach
Answers
A.
Phased approach
B.
Direct cutover
Answers
B.
Direct cutover
C.
Pilot study
Answers
C.
Pilot study
D.
Parallel run
Answers
D.
Parallel run
Suggested answer: D

Explanation:

The most effective way to minimize downtime during system conversions is to use a parallel run. A parallel run is a method of system conversion where both the old and new systems operate simultaneously for a period of time until the new system is verified to be functioning correctly. This reduces the risk of errors, data loss, or system failure during conversion and allows for a smooth transition from one system to another.Reference:CISA Review Manual, 27th Edition, page 467

Topic 2, Exam Pool B

asked 18/09/2024
Dirk Prinsloo
34 questions
User
Your answer:
0 comments
Sorted by

Leave a comment first