A risk practitioner observes that hardware failure incidents have been increasing over the last few months. However, due to built-in redundancy and fault-tolerant architecture, there have been no interruptions to business operations. The risk practitioner should conclude that:

A.
a root cause analysis is required
Answers
A.
a root cause analysis is required
B.
controls are effective for ensuring continuity
Answers
B.
controls are effective for ensuring continuity
C.
hardware needs to be upgraded
Answers
C.
hardware needs to be upgraded
D.
no action is required as there was no impact
Answers
D.
no action is required as there was no impact
Suggested answer: A