List of questions
Related questions
Question 15 - JN0-1332 discussion
Refer to the exhibit.
You arc designing a security solution using an SRX Series chassis duster in two separate buildings In this scenario, what are three considerations? (Choose three )
A.
The switches connecting to interface fab1 must support jumbo frames
B.
Latency on the fabric path must be under 1000 ms
C.
Latency on the control path must be under 100 ms
D.
The switches connecting to interface fxp: must support jumbo frames
E.
Both HA Inks must be on physically different switches.
Your answer:
0 comments
Sorted by
Leave a comment first