List of questions
Related questions
Question 103 - Certified B2C Commerce Developer discussion
There is an existing job that captures and sends a report of all the SFCC orders captured in a day for North America at 12:00 AM EST. The developer is asked to also send another report for all the orders placed for Europe at 12:00 AM
UTC.
How should a developer achieve both of these requirements?
A.
Use a flow and set up execution of both job steps at the specified time
B.
Create a new job specific to Europe to run at the specified time
C.
Add a new job step to the existing North America job to capture and send a report for all these Europe orders
D.
Modify the existing Job and add site-specific job run-times to the Scheduling tab
Your answer:
0 comments
Sorted by
Leave a comment first