Why a re-analysis of measurement system is required in a Six Sigma project?

A.
It is mandatory requirement as per MSA
Answers
A.
It is mandatory requirement as per MSA
B.
More precise measurements may be required due to reduction in variability
Answers
B.
More precise measurements may be required due to reduction in variability
C.
Since most of the Six Sigma projects use statistical softwares that require re-analysis
Answers
C.
Since most of the Six Sigma projects use statistical softwares that require re-analysis
D.
Re-analysis is done only when the previous analysis is detected to be incorrect
Answers
D.
Re-analysis is done only when the previous analysis is detected to be incorrect
Suggested answer: C, D