Which statement(s) describe an undesirable situation when implementing SPC?
A.
The lower Control Limit for the R chart is equal to zero
B.
Attempt to use SPC for tracking transaction times at a warehouse
C.
A process is in Statistical Control before implementation of SPC
D.
The Control Limits are wider than the customer specification limits
Your answer: