Question 146 - ICGB discussion
Which of these statements describe an undesirable situation when implementing SPC? (Note: There are 2 correct answers).
A.
The lower Control Limit for the R chart is equal to zero
B.
The Control Limits are wider than the customer specification limits
C.
A process is in Statistical Control before implementation of SPC
D.
Attempt to use SPC for tracking transaction times at a warehouse
E.
Indication of the specification limits on the Control Chart