You are preparing to install a new 2-node AFF A250 system at a customer site with an existing cluster that uses NetApp CN1610 cluster interconnect switches.

In this scenario, what are two valid actions for this installation? (Choose two.)

A.
Add the new nodes to the existing cluster and switches.
Answers
A.
Add the new nodes to the existing cluster and switches.
B.
Create a new 2-node switched cluster that uses the CN1610 cluster switches.
Answers
B.
Create a new 2-node switched cluster that uses the CN1610 cluster switches.
C.
Create a new 2-node switchless cluster.
Answers
C.
Create a new 2-node switchless cluster.
D.
Migrate the existing cluster to new switches and add the new nodes.
Answers
D.
Migrate the existing cluster to new switches and add the new nodes.
Suggested answer: B, D

Explanation:

Reference:

https://kb.netapp.com/Advice_and_Troubleshooting/Flash_Storage/AFF_Series/Controller_Hardware_Upgrade3A_Adding_AFF_A250_nodes_to_existing_cluster_report_HA_interconnect_errors_and_cannot_perform_takeover

asked 23/09/2024
Mark Wingate
31 questions
User
Your answer:
0 comments
Sorted by

Leave a comment first