ExamGecko
Question list
Search
Search

List of questions

Search

Related questions











Question 35 - NS0-184 discussion

Report
Export

You are preparing to add a 2-node AFF A250 system to an existing 4-node AFF A800 cluster with Cisco Nexus 3232C switches. The cluster switches are currently running the Cluster-HA RCF.

In this scenario, which two steps are required to install the AFF A250 system? (Choose two.)

A.
Load the Storage RCF.
Answers
A.
Load the Storage RCF.
B.
Cable the AFF A250 nodes to the next free ports on the switch.
Answers
B.
Cable the AFF A250 nodes to the next free ports on the switch.
C.
Cable the AFF A250 nodes to the breakout ports on the switch.
Answers
C.
Cable the AFF A250 nodes to the breakout ports on the switch.
D.
Load the Cluster-HA-Breakout RCF.
Answers
D.
Load the Cluster-HA-Breakout RCF.
Suggested answer: C, D
asked 23/09/2024
Abbas Ali
38 questions
User
Your answer:
0 comments
Sorted by

Leave a comment first