Based on customer requirements, a consultant conducted an AHV cluster deployment. Each node is configured with four NICs.
Which two components should the consultant manually update in the As-Built Guide? (Choose two.)
A.
Node Port Layout Diagram
B.
Network Cabling Diagram
C.
Logical Design Diagram
D.
Site installation Diagram