Question 399 - AZ-400 discussion
DRAG DROP
You have a project in Azure DevOps.
You need to configure a dashboard. The solution must include the following metrics:
• Bottlenecks in the software development process
• A burndown chart for the work in a single iteration
• How long it takes to close a work item after the item was started
Which type of widget should you use for each metric? To answer, drag the appropriate widget types
to the correct metrics. Each widget type may be used once, more than once, or not at all. You may
need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.