Question 18 - DS0-001 discussion
Which of the following is the correct order of the steps in the database deployment process?
A)
1. Connect
2. Install
3. Configure
4. Confirm prerequisites
5. Validate
6. Test
7. Release
B)
1. Configure
2. Install
3. Connect
4. Test
5. Confirm prerequisites
6. Validate
7. Release
C)
1. Confirm prerequisites
2. Install
3. Configure
4. Connect
5. Test
6. Validate
7. Release
D)
1. Install
2. Configure
3. Confirm prerequisites
4. Connect
5. Test
6. Validate
7. Release
A.
Option A
B.
Option B
C.
Option C
D.
Option D