List of questions
Related questions
Question 428 - N10-008 discussion
On a network with redundant switches, a network administrator replaced one of the switches but was unable to get a connection with another switch. Which of the following should the administrator chock after successfully testing the cable that was wired for TIA/EIA-568A on both ends?
A.
If MDIX is enabled on the new switch
B.
If PoE is enabled
C.
If a plenum cable is being used
D.
If STP is disabled on the switches
Your answer:
0 comments
Sorted by
Leave a comment first