An architect is tasked with designing a new VMware software-defined data center (SDDC) using VMware vSAN. The architect uses a storage assessment tool to determine the storage requirements for the new vSAN cluster. The new SDDC is going to be deployed into the existing data center and must be connected to a shared core network switch.

The architect decides to use vSAN ReadyNodes with the following configuration:

Two disk groups with:

Write Intensive NVMe 800 GB drive for cache

Four 3.84 TB Mixed Use NVMe for capacity

Four 10 GbE ports

Which element represents a risk that should be included in this design?

A.
The number of 10 GbE capable ports in the vSAN ReadyNode
Answers
A.
The number of 10 GbE capable ports in the vSAN ReadyNode
B.
The use of vSAN ReadyNodes
Answers
B.
The use of vSAN ReadyNodes
C.
The existing network is 10 GbE capable
Answers
C.
The existing network is 10 GbE capable
D.
The use of NVMe drives for cache and capacity
Answers
D.
The use of NVMe drives for cache and capacity
Suggested answer: C