Question 19 - 300-425 discussion
A network engineer is preparing for an office site survey with a height of 2.5 meters. Which three components are recommended to complete the survey? (Choose three.)
A.
Use a battery pack to power APs
B.
Use a drawing of the office space to draw AP and client placements.
C.
Use DoS attack on APs while measuring the throughput.
D.
Use APs with directional antennas.
E.
Use APs with external antennas.
F.
Use APs with built-in antennas.
Your answer: