List of questions
Related questions
Question 156 - 300-425 discussion
An engineer must perform a predictive design for a wireless network for location readiness and to mitigate interference. Which power level does the engineer use?
A.
10 mw
B.
18 mw
C.
20 mw
D.
50 mw
Your answer:
0 comments
Sorted by
Leave a comment first