ExamGecko
Question list
Search
Search

List of questions

Search

Related questions











Question 266 - 350-601 discussion

Report
Export

An engineer must implement the FCoE on the Cisco Nexus 9000 Series Switch-based infrastructure. The deployment will contain dual-homed fabric extenders and must support jumbo frames with port channels. Which two sets of actions complete the configuration? (Choose two.)

A.

Option A

Answers
A.

Option A

B.

Option B

Answers
B.

Option B

C.

Option C

Answers
C.

Option C

D.

Option D

Answers
D.

Option D

E.

Option E

Answers
E.

Option E

Suggested answer: A, D

Explanation:

To implement FCoE on a Cisco Nexus 9000 Series Switch-based infrastructure that includes dual-homed fabric extenders and supports jumbo frames with port channels, the engineer must configure the system to handle large frame sizes and ensure FCoE functionality is enabled on the fabric extenders. The actions in Option A include configuring the interface with an MTU of 9516 to support jumbo frames and disabling NPIV, which is not required for FCoE operation on fabric extenders.Option D involves executing the command 'fcoe enable-fex' to enable FCoE on the fabric extenders and setting the MTU to 9216 on FEX uplinks to support jumbo frames1

asked 10/10/2024
Tyler Smith
42 questions
User
Your answer:
0 comments
Sorted by

Leave a comment first