Which of the following is a ninth step in Systems Design Life Cycle?

A.

Conversion

Answers
A.

Conversion

B.

Building

Answers
B.

Building

C.

System Analysis

Answers
C.

System Analysis

D.

Operations

Answers
D.

Operations

Suggested answer: A

Explanation:

Conversion is the process of changing the existing system to the new system. It involves transferring data, installing hardware and software, training users, and decommissioning the old system.Conversion is the ninth step in the Systems Design Life Cycle, according to the CITM study guide1Reference:1CITM Study Guide, Chapter 4: System Development Life Cycle, page 4-14.