ExamGecko
Question list
Search
Search

List of questions

Search

Related questions











Question 54 - AD01 discussion

Report
Export

Consider the following process flow:

What is the problem with this flow?

A.
There is nothing wrong with this flow.
Answers
A.
There is nothing wrong with this flow.
B.
The exception handling in this flow can be removed because an Attach action in a navigate stage should always work if configured correctly
Answers
B.
The exception handling in this flow can be removed because an Attach action in a navigate stage should always work if configured correctly
C.
The Attach Block should be enlarged to also include the Waited Long Enough decision stage.
Answers
C.
The Attach Block should be enlarged to also include the Waited Long Enough decision stage.
D.
The flow contains a recover stage and a route from it without a resume stage. This will cause internal errors on future exceptions thrown in the same session.
Answers
D.
The flow contains a recover stage and a route from it without a resume stage. This will cause internal errors on future exceptions thrown in the same session.
E.
The 0.5 second wait stage should be removed so that the retries can be performed at full speed.
Answers
E.
The 0.5 second wait stage should be removed so that the retries can be performed at full speed.
Suggested answer: A
asked 16/09/2024
Jelle Kamp
41 questions
User
Your answer:
0 comments
Sorted by

Leave a comment first