Consider the following diagram from an object studio action:
What is the problem with this flow?
A.
There is a risk of the flow causing an infinite loop
B.
There should be a wait stage at the end of the flow, before the end stage to ensure the flow logic has worked correctly
C.
There is nothing wrong with the object flow shown in this image.
D.
The Exception Block should be removed from the page so that all exceptions on that page can be recovered.