List of questions
Related questions
Question 7 - H13-629 discussion
An Engineer installed a OceanStor 9000 for a customer (a total of 5 OceanStor 9000 C Node, front and rear ends are 10GE TOE networking, on-site installation TOE network card). Then connected the signal lines, power lines, and debugged the software. During the installation there were issues. Which of the following description of these issues are correct? (Multiple choice.)
A.
5 devices TOE NIC A0, B1, and A0, B3 inserted into the PCIe slot will not affect the system. Deployment will not affect the network bandwidth, so it cannot be adjusted.
B.
The signal cables are long and need to be strapped to the cabinet or placed on the bottom tray.
C.
Label NODE 01 A0-0 The signal cable is inserted in the network port A0-1. The signal cable labeled NODE01 B3-1 is inserted in the network position B3-0, due to the same network card two network port peer, you can place the wrongline, you cannot adjust.
D.
CE6850 switch connected to two stacked copper cables, one of which is needed to post-cold more cold, because it does not affect the network interoperability. You can base this software debugging.
Your answer:
0 comments
Sorted by
Leave a comment first