To do the 5G transformation of 4G base stations, LTE anchor base stations and NR base stations are required to share the BBU frame, so which of the following practices is feasible?

A.
Replace BBU3900 with BBU5900
Answers
A.
Replace BBU3900 with BBU5900
B.
LBBPc is replaced with UBBPg veneer
Answers
B.
LBBPc is replaced with UBBPg veneer
C.
Use UMPTb as the main control board for 4G and NR
Answers
C.
Use UMPTb as the main control board for 4G and NR
D.
Use the BBU3910 as the chassis for 4G and NR
Answers
D.
Use the BBU3910 as the chassis for 4G and NR
Suggested answer: A, B