Given the following examples of entry and exit criteria:

1. A defined level of code coverage has been achieved

2. The test automation tool has been installed and properly configured

3. The number of unresolved defects is within the predefined limit

4. The performance test environment has been set-up and is available

5. The user stones hove proper acceptance criteria defined

6. The testing budget has been spent and the project sponsor bears the risk of not testing any further

Which of the following BEST categorizes them as entry and exit criteria:

A.
Entry criteria - 1, 3. 4; Exit criteria - 2. 5. 6
Answers
A.
Entry criteria - 1, 3. 4; Exit criteria - 2. 5. 6
B.
Entry criteria - 2. 4. 5; Exit criteria - 1. 3, 6
Answers
B.
Entry criteria - 2. 4. 5; Exit criteria - 1. 3, 6
C.
Entry criteria - 2. 4: Exit criteria - 1. 3. 5. 6
Answers
C.
Entry criteria - 2. 4: Exit criteria - 1. 3. 5. 6
D.
Entry criteria - 2, 4. 5, 6; Exit criteria -1.3
Answers
D.
Entry criteria - 2, 4. 5, 6; Exit criteria -1.3
Suggested answer: B

Explanation:

The correct answer is B, as it categorizes them as entry and exit criteria correctly.Entry criteria are conditions that must be met before testing can begin or continue with a specific activity or phase3.Exit criteria are conditions that must be met before testing can conclude or stop for a specific activity or phase3. The following table shows how each example can be categorized:

Therefore, option B is the correct answer.Options A, C, and D are incorrect, as they do not categorize them as entry and exit criteria correctly.

Reference:3, Section 2.4