You are about to replace a failed Brocade Fibre Channel switch. Which three steps do you take prior to connecting the switch in the SAN? (Choose three.)
A.
Force the new switch to be the principle switch.
B.
Change the domain ID of the replacement switch to the domain ID of the failed switch.
C.
Clear all zoning configurations on the replacement switch.
D.
Change the core PID format of the replacement switch to the core PID format of the failed switch.
E.
Preload the zoning information from the fabric onto the new switch.