Cisco 350-601 Practice Test - Questions Answers, Page 44
List of questions
Related questions
DRAG DROP
An engineer must shut down the Ethernet 1/2 interface when the Ethernet 4/5 interface state is down. Drag and drop the CLI commands from the bottom onto the blanks in the exhibit to implement this EEM. Not all commands are used.
DRAG DROP
Drag and drop the fields for configuring a full state backup file of the Cisco UCS Manager from the left onto the descriptions on the right.
DRAG DROP
A network engineer must implement a telemetry solution to collect real-time structured data in a large-scale network. Drag and drop the actions from the left into the order on the right to implement the solution. Not all actions are used.
DRAG DROP
An engineer must configure a control plane policy on a Cisco Nexus 9000 Series Switch that is located at IP 192.168 20.1 that moots those requirements Only HTTP. RDP. and ICMP traffic is permitted from subnet 192.168.10.0/24.
The committed information rate must be 54000 pps.
The burst size must be 128 packets.
Any other traffic must be dropped.
Drag and drop the code snippets from the bottom onto the blanks in the code on the top to complete the configuration. Not all code snippets are used
DRAG DROP
Drag and drop the steps on the left onto the order that they must be implemented on the right to recover a fabric interconnect when there is no working image on the bootflash.
An engineer is implementing the Cisco ACI fabric and wants to reduce the amount of TCAM resources consumed by the fabric The engineer also needs to ensure that all EPGs m a VRF consume the same services Which action should be taken to meet these requirements?
Configure a single contract provided and consumed in all EPGs
Configure preferred groups in the VRF for al EPGs
Implement an unenforced VRF
Implement vzAny feature
An engineer must deploy a Cisco UCS C-Series Server with a single VIC 1455 integrated into a Cisco UCS Manager cluster. Two fiber connections are available, and the deployment has no fabric extenders. Which set of actions accomplishes this goal?
Reset the system using Cisco IMC to its factory default settings. Attach VIC port 1 and 3 to Fabric Interconnects.
Configure VIC attached ports as Uplink ports on fabric interconnects. Insert 1000Base-T RJ45 SFP in VIC port 1 and 3.
Reset the system using Cisco IMC to its factory default settings. Insert 1000Base-T RJ45 SFP in VIC port 1 and 3.
Configure VIC attached ports as Uplink ports on fabric interconnects. Attach VIC port 1 and 3 to Fabric Interconnects.
An engineer must configure device aliases for a Cisco MDS 9000 Series Switches-based SAN fabric. The configuration must meet these requirements:
* The engineer must be prompted before the changes are committed to the database.
* Pending changes must be explicitly displayed on the console.
Which command accomplishes this task?
device-alias enhanced
device-alias commit
device-alias confirm-commit
device-alias distribute diffs-only
Refer to the exhibit.
An engineer configures an FCoE connection between a Cisco UCS and a Cisco Nexus 9000 Series Switch. The UCS FI-A
connects to the Nexus switch using interface e1/12. All relevant configurations have been completed on the Nexus switch to support FCoE
deployment. Which action must be taken on Cisco UCS Manager to complete the configuration?
Trunk VLAN 500 on interface e1/12.
Create a Virtual Fibre Channel Interface.
Change the Transport Type to FCoE.
Configure an FCoE uplink interface.
An engineer must configure a Cisco MDS 9000 Series Switch to store generated log messages to a file. The file must store logs of the severity of 'warning' and above, and the file size must not exceed 20,000 bytes. Which command accomplishes this task?
logging logfile LogFile 5 size 2000
logging logfile messages 2 size 2500
logging logfile Local 4 size 20000
logging logfile Logs 3 size 160000
Question