Question 61

What are two types of FC/FCoE oversubscription ratios? (Choose two.)
server storage to end-node count
port bandwidth to uplink bandwidth
edge ISL bandwidth to core ISL bandwidth
host bandwidth to storage bandwidth
switch processing power to end-node processing power
FC/FCoE oversubscription ratios refer to the relationship between the bandwidth provided and the bandwidth required. Common types of oversubscription ratios include port bandwidth to uplink bandwidth (B), which measures the bandwidth available at the access layer compared to the uplink, and host bandwidth to storage bandwidth (D), which relates to the bandwidth demand from servers compared to the available storage bandwidth.
https://www.ciscolive.com/c/dam/r/ciscolive/us/docs/2017/pdf/BRKDCN-1121.pdf
https://www.cisco.com/c/en/us/td/docs/switches/datacenter/nexus5000/sw/operations/n5k_fcoe_ops.html
Question 62

Due to a domain name change at a customer site, a Cisco UCS cluster must be renamed. An engineer must recommend a solution to ensure that the Cisco UCS Manager is available over HTTPS. Which action accomplishes this goal?
Reinstall the cluster to generate the default key ring certificate
Generate a new default key ring certificate from the Cisco UCS Manager
Reboot the SSO component of the Cisco UCS Manager
Regenerate the default key ring certificate manually
When there is a domain name change, and the Cisco UCS Manager needs to be available over HTTPS, generating a new default key ring certificate from the Cisco UCS Manager (B) is typically the recommended action. This ensures that the HTTPS service has a valid certificate that matches the new domain name.
https://www.cisco.com/c/en/us/td/docs/unified_computing/ucs/ucs-manager/GUI-User-Guides/Admin-Management/3-1/b_Cisco_UCS_Admin_Mgmt_Guide_3_1/b_Cisco_UCS_Admin_Mgmt_Guide_3_1_chapter_0110.html
Question 63

DRAG DROP
An engineer is implementing NetFlow on a Cisco Nexus 7000 Series Switch.
Drag and drop the NetFlow commands from the left into the correct order they must be entered on the right.
Reference: https://www.cisco.com/c/en/us/support/docs/switches/nexus-7000-series-switches/112213-netflow-nexus7000-nsox-configex.html
Question 64

DRAG DROP
Refer to the exhibit. In a bidirectional PIM network using Phantom RP as an RP redundancy mechanism, two Cisco NX-OS routers have these requirements:
R1 must be the active RP.
R2 must be the backup RP that is used only if R1 is not reachable.
Drag and drop the configuration steps to complete the configuration for Router 2. Not all configuration steps are used.
Reference:
https://community.cisco.com/t5/networking-documents/rp-redundancy-with-pim-bidir-phantom-rp/ta-p/3117191
Question 65

DRAG DROP
An engineer deploys a custom guest shell rootfs onto multiple switches.
Drag and drop the steps from the left into the correct order on the right.
Export the Guest Shell rootfs.
Question 66

DRAG DROP
An engineer is configuring VNTag between a virtualized server and a Cisco Nexus 5500 Series switch.
Drag and drop the configuration steps from the left into the correct order on the right.
Reference:
https://www.cisco.com/c/en/us/td/docs/switches/datacenter/nexus5500/sw/adapter-fex/6x/b_5500_Adapter_FEX_Config_6x/b_5500_Adapter_FEX_Config_602N11_chapter_010.html
Question 67

DRAG DROP
An engineer deploys a custom Guest Shell rootfs on a Nexus 9000 Series Switch. Drag and drop the steps from the left into the order required to deploy the solution on the right. Not all options are used.
Reference:
https://www.cisco.com/c/en/us/td/docs/switches/datacenter/nexus9000/sw/7-x/programmability/guide/b_Cisco_Nexus_9000_Series_NX-OS_Programmability_Guide_7x/Guest_Shell.html
https://www.ciscolive.com/c/dam/r/ciscolive/us/docs/2018/pdf/BRKDCN-2015.pdf
Question 68

DRAG DROP
A network engineer must implement RBAC on Cisco MDS 9000 Series Multilayer Switches.
Drag and drop the Cisco MDS 9000 Series roles from the left onto the categories they belong to on the right.
Reference: https://www.cisco.com/c/en/us/td/docs/unified_computing/ucs/ucs-manager/GUI-User-Guides/Admin-Management/3-1/b_Cisco_UCS_Admin_Mgmt_Guide_3_1/b_UCSM_Admin_Mgmt_Guide_chapter_01.html
Question 69

DRAG DROP
An engineer is implementing security on the Cisco MDS 9000 switch.
Drag and drop the descriptions from the left onto the correct security features on the right.
Question 70

DRAG DROP
Drag and drop the storage technologies from the left onto the correct descriptions on the right.
Question