You want to reduce planning efforts for B C classified materials. Which planning procedure do you recommend?
Consumption Based Planning
Subassembly Planning
Advanced Planning
Material Requirements Planning
What are some benefits of planning with planned independent requirements for finished materials? Note: There are 2 correct answers to this question.
Reduced delivery times
Reduced times for final assembly
Option to forecast planning for production resources
Option to use maketoorder production
Your company produces a finished good based on a forecast expects it to be in stock when customers order it. If customers order more than the forecasted quantity this must NOT have any impact on the production program.
Which planning strategy do you use?
Assembly processing with production orders (82)
Planning with final assembly (40)
Planning without final assembly (50)
Maketostock production (10)
What is the difference between coproducts byproducts?Note: There are 2 correct answers to this question.
Only coproducts have a nonzero inventory valuation.
Only coproducts have movement type 531.
Only coproducts have movement type 101.
Only coproducts appear in the process or production order settlement rule.
Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.
In which storage location is the BOM required?
Is the material type allowed in the BOM?
Which base unit of measure does the material have?
What status does the BOM have?
How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question.
Select a special procurement type inside the material master.
Use a special item category in your material BOM (bill of material).
Select a special MRP type inside the material master.
Define the special procurement type inside the material BOM (bill of material).
Under what circumstances can you change the material type for a material if stocks reservations or purchasing documents exist? Note: There are 2 correct answers to this question.
The quantity value updates are the same.
The same batch management level is used.
The same base unit of measure is used.
The same account category is used.
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
Wait time
Float before production
Processing time
Pick time
Setup time
Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.
First in first out (FIFO)
Simultaneous
Manual maintenance
100% check
What data can you maintain in the subitems of a bill of material (BOM)? Note: There are 2 correct answers to this question.
Quantity
Status
Installation point
Scrap percentage