ExamGecko
Home / VMware / 3V0-21.23 / List of questions
Ask Question

VMware 3V0-21.23 Practice Test - Questions Answers, Page 5

Add to Whishlist

List of questions

Question 41

Report Export Collapse

What is a benefit of using workload domains in VMware Cloud Foundation?

Become a Premium Member for full access
  Unlock Premium Member

Question 42

Report Export Collapse

An architect is designing a new hosting platform for a healthcare provider with proposed locations in three regional areas.

The following set of requirements have been provided by key stakeholders:

REQ001 - The hosting platform must support long distance vMotion between the primary and secondary site.

REQ002 - The maximum RTT (round-trip time) latency between the primary site and the secondary site must be less than 150milliseconds.

REQ003 - The hosting platform must be manageable from assets located in the third site.

REQ004 - Each location must scale to support a minimum of 35TB storage.

Which requirement would be classified as a technical (formerly non-functional) requirement for the new hosting platform?

Become a Premium Member for full access
  Unlock Premium Member

Question 43

Report Export Collapse

An architect is responsible for the design of a greenfield vSphere-based solution for hosting a new web-based application. The customer has provided the following high-level information:

The solution will host a highly transactional web application that is spread across multiple workloads within a vSphere cluster.

The workloads should be distributed evenly across the hosts to maximize the performance and availability of the web application.

The architect has made various design decisions, including:

The solution will deploy vSphere distributed switches for all virtual networking.

Which network load balancing method should the architect document in the physical design to meet the requirements?

Become a Premium Member for full access
  Unlock Premium Member

Question 44

Report Export Collapse

An architect is working with stakeholders to define requirements for architecting a new VMware vSphere design.

What are two strategies for engaging with stakeholders to achieve this goal? (Choose two.)

Become a Premium Member for full access
  Unlock Premium Member

Question 45

Report Export Collapse

An architect is updating an existing design to include a new vSphere cluster to meet the following customer requirements:

The solution must provide automatic load redistribution of workloads across all resources in the cluster

The solution must consider the usage patterns of workloads when performing load redistribution

The solution must provide capacity to reserve resources equal to two ESXi hosts for failover in the event of a host failure

The architect has also collected the following assumptions and constraints during the design workshops:

A001 - Budget is available for additional hardware and software if required to meet the solution requirements

A002 - Capacity is available to allow the deployment of additional tooling to manage the solution

C001 - All management workloads must be deployed to the existing vSphere management cluster

Which three design decisions should the architect include to meet the documented requirements? (Choose three.)

Become a Premium Member for full access
  Unlock Premium Member

Question 46

Report Export Collapse

An architect is designing a new workload domain in an existing VMware Cloud Foundation environment. The customer requirement is to physically separate the vSAN network traffic from other management network flows.

Which design decision should the architect make to meet this requirement?

Become a Premium Member for full access
  Unlock Premium Member

Question 47

Report Export Collapse

An architect is designing a new vSphere solution. The customer has stated that the solution will be used to host different types of applications, some of which have special considerations. The customer has provided the following information in relation to the special considerations:

The applications are sensitive to the time it takes for CPUs to be accessible to process instructions

The applications send and receive large amounts of data across the network

The applications are sensitive to the time it takes for the data to be sent and received at the destination

What could the architect include in the design for these considerations?

Become a Premium Member for full access
  Unlock Premium Member

Question 48

Report Export Collapse

Which is a benefit of using vSAN stretched clusters in VMware Cloud Foundation?

Become a Premium Member for full access
  Unlock Premium Member

Question 49

Report Export Collapse

An architect is documenting the logical design for a new vSphere solution. The following requirements have been provided to the architect by the customer for the design:

The solution must be deployed in two locations: DC1 and DC2

The solution must limit the impact radius of accidental changes by administrators

The solution must meet a recovery time objective (RTO) of four (4) hours and recovery point objective (RPO) of 24hours

The solution must allow workloads to run in both DC1 and DC2 during normal operations

The solution must allow workloads to be moved bi-directionally between DC1 and DC2

The solution must use hyper-converged infrastructure for the virtual machine storage

The customer has also confirmed that the network connection between DC1 and DC2 has a 10Gbps bandwidth with a maximum round trip latency of 4ms.

The architect recommends the following design decision:

Use separate clusters in DC1 and DC2 to form a multi-region design

What should the architect include as justification for this design decision?

Become a Premium Member for full access
  Unlock Premium Member

Question 50

Report Export Collapse

What is an example of a performance design quality?

Become a Premium Member for full access
  Unlock Premium Member
Total 92 questions
Go to page: of 10
Search

Related questions









An architect is responsible for the lifecycle management design for a brownfield vSphere-based solution. The following information has been provided during initial meetings around the new solution: Existing heterogeneous server hardware will be used to provide the hosting platform. The available hardware is: - 10 servers that contain 2 x 20-Core Intel Xeon processors and 512GB RAM from Vendor A - 10 servers that contain 2 x 24-Core Intel Xeon processors and 768GB RAM from Vendor A - 20 servers that contain 2 x 16-Core AMD EPYC processors and 512GB RAM from Vendor B - 10 servers that contain 1 x 24-Core AMD EPYC processors and 256GB RAM from Vendor B All of the hardware is currently listed on the VMware Hardware Compatibility List (HCL). All existing server hardware has 36months vendor support remaining. The requirements from the customer are: REQ001 - The solution must support the hosting of 5,000 workloads spread across two physical sites. REQ002 - The solution should minimize the number of clusters. REQ003 - The solution must ensure that there is no impact to service when completing upgrades. Given the resource requirements needed for the solution, the architect has calculated that all of the existing servers will be required to provide sufficient resources for the new environment. The Intel-based (Vendor A) servers will be deployed to the primary site and both the Intel-based and AMD-based servers (Vendor B) will be deployed to the secondary site. Which assumption should the architect make to support the lifecycle management of vSphere 8?