Adobe AD0-E902 Practice Test - Questions Answers, Page 3

List of questions
Question 21

What information can be understood from the images of this bundle inspector?
Question 22

A Fusion scenario is making too many requests to a third-party API, which returns a 429 'Too Many Requests' error Which technique reduces the number of API requests?
Question 23

Which statement about the differences between instant and polling triggers is true?
Question 24

A Fusion designer is unhappy with the high number of bundles passing through an instant Watch Events module that monitors Workfront project updates.
Which action reduces the number of bundles passing through the module?
Question 25

Which module must a user select to upload a document into Workfront and attach it to a task?
Question 26

A source system provides a list of users and their job roles and departments. The destination system requires the job role values be revised to match the job roles by different department. The end users currently use a spreadsheet to manage that mapping. Updates to this list are infrequent, and management requires more security than the current process offers.
Which method is appropriate for this use case?
Question 27

A scenario is too large, with too many modules. Which technique can reduce the number of modules?
Question 28

A Fusion designer discovers that an iteration is processing thousands of bundles, though it should not need to.
What should the designer do to reduce the number of bundles?
Question 29

Refer to the exhibit.
This scenario shows a 1 in the bundle inspector for the Tasks module and a 23 in the bundle inspector for the Project module.
What does the number in the bundle inspector represent?
Question 30

A Fusion scenario updates project conditions each night, and should set the project condition to At Risk if there are any high priority open issues on the project. The scenario retrieves all open projects and cycles through the projects. For each project with issues, it retrieves all associated open issues, iterates through them and sets the project condition to At Risk if the issue is high priority or On Target if it is not.
A user notices that Fusion is updating the progress condition multiple times, once for each issue in the project.
How can the developer ensure the project is updated only once?
Question