ExamGecko
Home Home / Huawei / H12-724

Huawei H12-724 Practice Test - Questions Answers, Page 37

Question list
Search
Search

Related questions











Use the command on the switch to view the status of free mobility deployment, the command is as follows:

For the above command, which of the following descriptions is correct?

A.
The control server address is 10.1.10.34
A.
The control server address is 10.1.10.34
Answers
B.
The authentication device address is 10.1.31.78
B.
The authentication device address is 10.1.31.78
Answers
C.
Status is"Working"Indicates that the switch and Controller Linkage is successful
C.
Status is"Working"Indicates that the switch and Controller Linkage is successful
Answers
D.
current Controller The server is backup n
D.
current Controller The server is backup n
Answers
Suggested answer: C

In the Agile Controller-Campus solution, which device is usually used as the hardware SACG?

A.
router
A.
router
Answers
B.
switch
B.
switch
Answers
C.
Firewall
C.
Firewall
Answers
D.
IPS
D.
IPS
Answers
Suggested answer: C

Deployed by an enterprise network managerAgile Controller-Campus withSACG Later;Identity authentication is successful but cannot access the post-authentication domain, This phenomenon may be caused by any reason? (Multiple choice)

A.
A serious violation will prohibit access to the post-authentication domain.
A.
A serious violation will prohibit access to the post-authentication domain.
Answers
B.
The access control list of the post-authentication domain has not been delivered SACG.
B.
The access control list of the post-authentication domain has not been delivered SACG.
Answers
C.
ALC The number of rules issued is too many, and a lot of time is required to match, causing interruption of access services.
C.
ALC The number of rules issued is too many, and a lot of time is required to match, causing interruption of access services.
Answers
D.
Agile Controller-Campus Wrong post-authentication domain resources are configured on the server.
D.
Agile Controller-Campus Wrong post-authentication domain resources are configured on the server.
Answers
Suggested answer: A, B, D

Regarding the policy for checking account security, which of the following descriptions are correct?

(Multiple choice)

A.
You can check whether there is a weak password.
A.
You can check whether there is a weak password.
Answers
B.
You can check whether the account has joined a specific group.
B.
You can check whether the account has joined a specific group.
Answers
C.
It cannot be repaired automatically._
C.
It cannot be repaired automatically._
Answers
D.
It is not possible to check whether the password length meets the requirements.
D.
It is not possible to check whether the password length meets the requirements.
Answers
Suggested answer: A, B

If the self-determined meter function is enabled on the Agile Controller-Campus and the account PMAC address is bound, Within a period of time, the number of incorrect cipher input by the end user during authentication exceeds the limit.

Which of the following descriptions is correct?

(multiple choice)

A.
When the account number is reserved, only the sword type number cannot be authenticated on the bound terminal device, and it can be authenticated normally on other terminal devices.
A.
When the account number is reserved, only the sword type number cannot be authenticated on the bound terminal device, and it can be authenticated normally on other terminal devices.
Answers
B.
The account is locked on all terminal devices and cannot be recognized.
B.
The account is locked on all terminal devices and cannot be recognized.
Answers
C.
If you want to lock out the account, the administrator can only delete the account from the list.
C.
If you want to lock out the account, the administrator can only delete the account from the list.
Answers
D.
After the lock time, the account will be automatically unlocked
D.
After the lock time, the account will be automatically unlocked
Answers
Suggested answer: A, D

The AD/LDAP account can be synchronized to the Agile Controller-Campus or not to the Agile Controller-Campus. Synchronize.

The Agile Controller-Campus can only be authorized by user group. If it is not synchronized to the Agile Controller-Campus, it can be fine-tuned based on the account.

Authorization

A.
True
A.
True
Answers
B.
False
B.
False
Answers
Suggested answer: B

In the campus network, employees can use 802.1X, Portal, MAC Address or SACG Way to access. Use different access methods according to different needs to achieve the purpose of user access control.

A.
True
A.
True
Answers
B.
False
B.
False
Answers
Suggested answer: A

Explanation:


Total 367 questions
Go to page: of 37