Question 11

Report Export Collapse

Your customer has the following HPE Synergy setup

- 3 HPE Synergy 12000 Frames

- 4 HPE Virtual Connect SE 100 Gb F32 Modules

- 2 HPE Synergy 50 GO Interconnect Link Modules

- 36 HPE Synergy 480 Gen10 Plus compute modules

- 2 HPE Composer 2 modules

Which statement about this setup is true?

To use all compute nodes, the customer must create at least two logical enclosures
To use all compute nodes, the customer must create at least two logical enclosures
To manage all frames, the customer must buy two additional HPE Composer 2 modules
To manage all frames, the customer must buy two additional HPE Composer 2 modules
The customer must buy 36 HPE OneView Advanced licenses to manage compute modules
The customer must buy 36 HPE OneView Advanced licenses to manage compute modules
The customer can add one D3940 storage Module to each of the frames
The customer can add one D3940 storage Module to each of the frames
Suggested answer: C
asked 16/09/2024
karl hickey
46 questions

Question 12

Report Export Collapse

Which statement about HPE Superdome Flex 280 is true?

It supports 2 to 8 sockets in 2-socket increments.
It supports 2 to 8 sockets in 2-socket increments.
it cannot be managed using HPE OneView.
it cannot be managed using HPE OneView.
It must be equipped with at least 768 GB of memory.
It must be equipped with at least 768 GB of memory.
It can support up to two nPars with an external RMC.
It can support up to two nPars with an external RMC.
Suggested answer: C
asked 16/09/2024
Janina Loveria
48 questions

Question 13

Report Export Collapse

You are troubleshooting an HPE OneView server profile that presents a critical state. The server profile was configured with a Link Aggregation Group What should you check to fix the issue?

if both FiexNICs are configured with the same speed
if both FiexNICs are configured with the same speed
If the logical enclosure is built on at least three HPE Synergy frames
If the logical enclosure is built on at least three HPE Synergy frames
if both FiexNICs are connected to different networks
if both FiexNICs are connected to different networks
if the logical enclosure is configured with redundant master modules
if the logical enclosure is configured with redundant master modules
Suggested answer: A
asked 16/09/2024
S Tharakanparampil
44 questions

Question 14

Report Export Collapse

Your customer experienced some problems caused by outdated HPE Superdome Flex firmware.

Which update method should they use to avoid these issues in the future?

HPE OneView method for I/O firmware update procedure
HPE OneView method for I/O firmware update procedure
RMC CLI to update I/O and HPE Persistent Memory firmware
RMC CLI to update I/O and HPE Persistent Memory firmware
HPE OneView IT HPE Persistent Memory firmware must be updated.
HPE OneView IT HPE Persistent Memory firmware must be updated.
HPE SUM if HPE Persistent Memory firmware must be updated
HPE SUM if HPE Persistent Memory firmware must be updated
Suggested answer: B
asked 16/09/2024
Arkadi Popov
43 questions

Question 15

Report Export Collapse

Your customer needs to move an application from an HPE Synergy 480 Gen10 Compute Module to an HPE Synergy 660 Gen 10 Compute Module. The 480 has a switch that has been manually zoned outside of HPE OneView.

What must the customer do before migrating the application?

Become a Premium Member for full access
  Unlock Premium Member

Question 16

Report Export Collapse

Your customer has me following HPE Synergy setup

- Three frames fully populated with HPE Synergy 480 Gen10 Plus modules and 25Gb/s downlink speed formulating a single logical enclosure

- Two HPE Virtual Connect SE 100Gb F32 Module for Synergy

- Four HPE Synergy 50Gb interconnect Link Module

- Six HPE Synergy Virtual Connect SE 32Gb FC Modules

The customer needs to add a frame.

Which statement about the expansion of this setup is true?

Become a Premium Member for full access
  Unlock Premium Member

Question 17

Report Export Collapse

Your customer plans to deploy HPE OneView for VMware vCenter Server together with HPE Storage Integration Pack for VMware vCenter. The customer wants to use them to manage HPE Synergy Gen10 compute modules. HPE ProLiant

Gen 10 servers and an MSA array.

Which statement about compatibility of the existing environment with the planned software components is true?

Become a Premium Member for full access
  Unlock Premium Member

Question 18

Report Export Collapse

Refer to the exhibit.

HP HPE0-S60 image Question 18 13042 09162024180358000000

Which statement about this logical interconnect group is true?

Become a Premium Member for full access
  Unlock Premium Member

Question 19

Report Export Collapse

Your customer plans to add four HPE Synergy frames to an existing management ring Ail installed frames are equipped with two 2-port FLM modules, while new frames will be equipped with 4-port FLM modules.

Which statement about mixing different FLM modules is true?

Become a Premium Member for full access
  Unlock Premium Member

Question 20

Report Export Collapse

You plan to configure a Link Aggregation Group (LAG) for two connections within a server profile for a compute node running an ESXI system.

What is required from the VMware side to enable LAG?