ExamGecko
Home / Nutanix / NCM-MCI / List of questions
Ask Question

Nutanix NCM-MCI Practice Test - Questions Answers, Page 6

Add to Whishlist

List of questions

Question 51

Report Export Collapse

A customer needs a DR solution designed around the following requirements:

• There are 8 ms of latency between Sites A and B

• The administrator needs the shortest RPO/RTO possible

• Application consistent snapshots are required

• Use of Nutanix VSS

Which Data Protection Method should be used?

Become a Premium Member for full access
  Unlock Premium Member

Question 52

Report Export Collapse

An administrator needs to replace the self-signed certificate on a cluster. Which two requirements must be met as part of the process? (Choose two.)

Become a Premium Member for full access
  Unlock Premium Member

Question 53

Report Export Collapse

An administrator needs to evaluate if the existing configuration of Protection Domains meets the specified corporate recovery policy for SQL Dat a. The corporate policy requires that all SQL Servers be recoverable at the DR site within 30 minutes, and must result in a maximum of 60 minutes of data loss. SQL data must be required.

The protection domain is configured as follows:

• Application consistent snapshots are enabled

• The SQL server VMs are assigned to the Protection Domain as their own Consistency Group

• The Protection Domain schedule is configured as snapshots taken every 90 minutes from 7 am until 8 pm What must be changed to meet the required policy?

Become a Premium Member for full access
  Unlock Premium Member

Question 54

Report Export Collapse

An administrator is monitoring the Nutanix v5.15-based AOS cluster performance logs and notices that a SQL server VM is greatly exceeding its intended maximum IOPS. The administrator has confirmed that a QoS policy was previously created for the group of VMs this server is a member of.

What are two reasons that this VM would exceed its maximum configured IOPS from the QoS Policy?

(Choose two.)

Become a Premium Member for full access
  Unlock Premium Member

Question 55

Report Export Collapse

An administrator needs to make sure an RF3 cluster can survive a failure of two complete racks without negatively affecting performance. The current cluster configuration consists of the following:

• 30 All Flash Nodes: distributed 10 nodes per rack across three 42U racks

• Each node is configured with 20TB usable storage all flash (Cluster Total 600TB Usable)

• Current cluster utilization is 500TB storage

• Storage containers have Erasure Coding enabled

Which configuration changes should be made to make sure the cluster meets the requirements?

Become a Premium Member for full access
  Unlock Premium Member

Question 56

Report Export Collapse

An administrator is managing multiple Windows and Linux VMs connected to Nutanix Volumes. The Linux VMs are experiencing intermittent connectivity issues. The Windows VMs do not experience the same issue.

Which option should the administrator use to resolve this issue?

Become a Premium Member for full access
  Unlock Premium Member

Question 57

Report Export Collapse

An administrator has two clusters: Site A and Site B.

Async DR is configured between the clusters as follows:

• Site A is the Primary Site

• Site B is the Secondary inactive Site, no VMs running

• Site A is fully in Production

• Site B used as Backup/Disaster Recovery

The customer wants to perform a planned failover between the sites.

How should the administrator accomplish this?

Become a Premium Member for full access
  Unlock Premium Member

Question 58

Report Export Collapse

Refer to the exhibit.

Nutanix NCM-MCI image Question 58 81070 09232024012120000000

After performing ESXi to AHV conversion on a cluster, the alerts shown in the exhibit display on Prism. What should the administrator do to resolve this issue efficiently?

Become a Premium Member for full access
  Unlock Premium Member

Question 59

Report Export Collapse

A system administrator needs to shut down an AHV node in a Nutanix cluster without causing service disruption. The administrator checks data resiliency and verifies that the cluster can tolerate a node down.

Nutanix NCM-MCI image Question 59 81071 09232024012917000000

Become a Premium Member for full access
  Unlock Premium Member

Question 60

Report Export Collapse

An administrator needs to initiate a new VDI project within a couple of months. Prism Central reports there are no storage resources to accommodate such workloads.

The administrator sees many powered-off VMs and has the authority to delete test VMs powered off at least for 30 days. Test VMs belong to the Test category.

Using Prism Central, which steps are required to identify the correct VMs to be deleted?

Become a Premium Member for full access
  Unlock Premium Member
Total 166 questions
Go to page: of 17
Search

Related questions