A customer needs a DR solution designed around the following requirements:

• There are 8 ms of latency between Sites A and B

• The administrator needs the shortest RPO/RTO possible

• Application consistent snapshots are required

• Use of Nutanix VSS

Which Data Protection Method should be used?

A.
Async
A.
Async
Answers
B.
Metro Availability
B.
Metro Availability
Answers
C.
Near Sync
C.
Near Sync
Answers
D.
Cloud Connect
D.
Cloud Connect
Answers
Suggested answer: C

Explanation:

Reference: https://portal.nutanix.com/page/documents/details?targetId=Prism-Element-Data-Protection-Guide-v5_18:wc-dr-application-consistent-snapshots-wc-r.html

An administrator needs to replace the self-signed certificate on a cluster. Which two requirements must be met as part of the process? (Choose two.)

A.
The cluster administrator must restart the interface gateway.
A.
The cluster administrator must restart the interface gateway.
Answers
B.
The signed, intermediate and root certificates are chained.
B.
The signed, intermediate and root certificates are chained.
Answers
C.
The existing certificate must be deleted prior to replacement.
C.
The existing certificate must be deleted prior to replacement.
Answers
D.
The imported files for the custom certificate must be PEM encoded.
D.
The imported files for the custom certificate must be PEM encoded.
Answers
Suggested answer: B, D

Explanation:

Reference: https://portal.nutanix.com/page/documents/details?targetId=Prism-Central-Guide-Prism-v55:mul-security-ssl-certificate-pc-t.html

An administrator needs to evaluate if the existing configuration of Protection Domains meets the specified corporate recovery policy for SQL Dat a. The corporate policy requires that all SQL Servers be recoverable at the DR site within 30 minutes, and must result in a maximum of 60 minutes of data loss. SQL data must be required.

The protection domain is configured as follows:

• Application consistent snapshots are enabled

• The SQL server VMs are assigned to the Protection Domain as their own Consistency Group

• The Protection Domain schedule is configured as snapshots taken every 90 minutes from 7 am until 8 pm What must be changed to meet the required policy?

A.
Revise the schedule tc be 15 minutes
A.
Revise the schedule tc be 15 minutes
Answers
B.
Revise the schedule to be 60 minutes
B.
Revise the schedule to be 60 minutes
Answers
C.
Revise the schedule to be 30 minutes
C.
Revise the schedule to be 30 minutes
Answers
D.
Revise the schedule to be 45 minutes
D.
Revise the schedule to be 45 minutes
Answers
Suggested answer: B

An administrator is monitoring the Nutanix v5.15-based AOS cluster performance logs and notices that a SQL server VM is greatly exceeding its intended maximum IOPS. The administrator has confirmed that a QoS policy was previously created for the group of VMs this server is a member of.

What are two reasons that this VM would exceed its maximum configured IOPS from the QoS Policy?

(Choose two.)

A.
The VM is missing the required snapshot needed to implement the QoS Policy.
A.
The VM is missing the required snapshot needed to implement the QoS Policy.
Answers
B.
The VM was not created as an AFS virtual machine.
B.
The VM was not created as an AFS virtual machine.
Answers
C.
The SQL Server VM has volume groups attached.
C.
The SQL Server VM has volume groups attached.
Answers
D.
It was cloned from another SQL Server VM that was a member of the QoS Policy.
D.
It was cloned from another SQL Server VM that was a member of the QoS Policy.
Answers
Suggested answer: B, C

Explanation:

Reference: https://portal.nutanix.com/page/documents/details?targetId=Prism-Central-Guide-Prism-v5_18:mul-storage-qos-pc-c.html

An administrator needs to make sure an RF3 cluster can survive a failure of two complete racks without negatively affecting performance. The current cluster configuration consists of the following:

• 30 All Flash Nodes: distributed 10 nodes per rack across three 42U racks

• Each node is configured with 20TB usable storage all flash (Cluster Total 600TB Usable)

• Current cluster utilization is 500TB storage

• Storage containers have Erasure Coding enabled

Which configuration changes should be made to make sure the cluster meets the requirements?

A.
Expand the cluster to 50 nodes distributed evenly across 5 racks
A.
Expand the cluster to 50 nodes distributed evenly across 5 racks
Answers
B.
Expand the cluster to 48 nodes distributed evenly across 6 racks
B.
Expand the cluster to 48 nodes distributed evenly across 6 racks
Answers
C.
Expand the cluster to 60 nodes distributed evenly across 6 racks
C.
Expand the cluster to 60 nodes distributed evenly across 6 racks
Answers
D.
Expand the cluster to 40 nodes distributed evenly across 5 racks
D.
Expand the cluster to 40 nodes distributed evenly across 5 racks
Answers
Suggested answer: C

Explanation:

Reference: https://portal.nutanix.com/page/documents/details?targetId=Web-Console-Guide-Prism-v5_17:arc-configure-fault-tolerance-rack-prism-c.html

An administrator is managing multiple Windows and Linux VMs connected to Nutanix Volumes. The Linux VMs are experiencing intermittent connectivity issues. The Windows VMs do not experience the same issue.

Which option should the administrator use to resolve this issue?

A.
Utilize Jumbo Frames
A.
Utilize Jumbo Frames
Answers
B.
Add additional disks to the Volume Group
B.
Add additional disks to the Volume Group
Answers
C.
Set the SCSI timeout value to 60
C.
Set the SCSI timeout value to 60
Answers
D.
Utilize a separate subnet for the Linux VMs
D.
Utilize a separate subnet for the Linux VMs
Answers
Suggested answer: C

Explanation:

Reference: https://kb.vmware.com/s/article/1009465

An administrator has two clusters: Site A and Site B.

Async DR is configured between the clusters as follows:

• Site A is the Primary Site

• Site B is the Secondary inactive Site, no VMs running

• Site A is fully in Production

• Site B used as Backup/Disaster Recovery

The customer wants to perform a planned failover between the sites.

How should the administrator accomplish this?

A.
Click Activate on the Secondary site within the Data Protection Dashboard
A.
Click Activate on the Secondary site within the Data Protection Dashboard
Answers
B.
Click Activate on the Secondary site and run deactive NCLI command on Primary site
B.
Click Activate on the Secondary site and run deactive NCLI command on Primary site
Answers
C.
Choose Migrate on the Secondary site within the Data Protection Dashboard
C.
Choose Migrate on the Secondary site within the Data Protection Dashboard
Answers
D.
Choose Migrate on the Primary site within the Data Protection Dashboard
D.
Choose Migrate on the Primary site within the Data Protection Dashboard
Answers
Suggested answer: D

Explanation:

Reference: https://portal.nutanix.com/page/documents/details?targetId=Web-Console-Guide-Prism-v510:wc-protection-domain-failover-wc-t.html

Refer to the exhibit.

After performing ESXi to AHV conversion on a cluster, the alerts shown in the exhibit display on Prism. What should the administrator do to resolve this issue efficiently?

A.
Remove the VMs. create a new Protection Domain, and add VMs to it
A.
Remove the VMs. create a new Protection Domain, and add VMs to it
Answers
B.
Remove VMs from the Protection Domain and add them back in.
B.
Remove VMs from the Protection Domain and add them back in.
Answers
C.
Delete the Protection Domain, create a new Protection Domain, and add the VMs to it
C.
Delete the Protection Domain, create a new Protection Domain, and add the VMs to it
Answers
D.
Create a new Protection Domain and add the VMs to rt.
D.
Create a new Protection Domain and add the VMs to rt.
Answers
Suggested answer: B

A system administrator needs to shut down an AHV node in a Nutanix cluster without causing service disruption. The administrator checks data resiliency and verifies that the cluster can tolerate a node down.

A.
1 allow vms2 sd CVM3 sd node
A.
1 allow vms2 sd CVM3 sd node
Answers
Suggested answer: A

Explanation:


An administrator needs to initiate a new VDI project within a couple of months. Prism Central reports there are no storage resources to accommodate such workloads.

The administrator sees many powered-off VMs and has the authority to delete test VMs powered off at least for 30 days. Test VMs belong to the Test category.

Using Prism Central, which steps are required to identify the correct VMs to be deleted?

A.
Use Capacity Runway to filter by Test and Powered-off VMs
A.
Use Capacity Runway to filter by Test and Powered-off VMs
Answers
B.
Filter VMs list, choose Test category and Inactive under Efficiency
B.
Filter VMs list, choose Test category and Inactive under Efficiency
Answers
C.
Create a new Scenario selecting Test VMs. filter by uptime
C.
Create a new Scenario selecting Test VMs. filter by uptime
Answers
D.
Create a new Project selecting Test VMs, sorting by power state
D.
Create a new Project selecting Test VMs, sorting by power state
Answers
Suggested answer: B

Explanation:

Total 166 questions