Network Appliance NS0-521 Practice Test - Questions Answers, Page 6
List of questions
Related questions
Click the Exhibit button.
A customer is testing a newly installed NetApp AFF A400 all-flash HA storage system. An SVM for FCP with a LUN on Node 1 has been configured, and a server has been connected as shown in the exhibit. For testing, the engineer plans to do a storage failover of Node 1.
After the failover, what is the expected status of the marked path?
A customer has a two-node NetApp ONTAP cluster that Is hosting FC LUNs for 64 SAN hosts. An administrator is tasked to add 40 more hosts to the environment.
What two actions would the administrator need to take to avoid potential performance problems with the environment? (Choose two.)
A customer wants to Implement a NetApp AFF system at a small remote site that has two ESXi servers that require SAN storage from the NetApp ONTAP based storage system. The servers will be directly connected, because the customer does not want to deploy any switches.
Which protocol should the customer use?
An administrator is planning a SAN implementation and needs to validate that the ESXI host and NetApp ONTAP software releases are supported.
Which tool is used to accomplish this?
During maintenance of A NetApp AFF ONTAP cluster, which two steps are needed to move the SAN UFs to new nodes that are members of a portset? (Choose two.)
A customer has a two-node NetApp AFF ASA cluster in an environment with a Cisco Fibre Channel SAN and Cisco UCS Servers. The customer wants to upgrade the UCS Server BIOS and the Cisco NX-OS system running on the switches.
Which NetApp resource should be consulted to check compatibility with the new versions?
What is the maximum size for a LUN in NetApp ONTAP 9.14.1 software?
A customer has data in a LUN on an existing third-party SAN storage system that will be migrated to a new NetApp AFF A400 all-flash MetroCluster system. The host connected to the LUN is a Windows Server 2019 system.
In this scenario, which two methods are supported? (Choose two.)
What needs to be done to create a consistent Snapshot copy of a LUN without disruptions?
An administrator has a NetApp AFF cluster supporting an application with twelve LUNs allocated across four volumes. There is a requirement to configure a Snapshot copy of all LUNs simultaneously as a single unit.
Which NetApp ONTAP command should be used to configure this requirement?
Question