Refer to the exhibit.
After a failover occurs, which two actions must be performed on Switch-B to manually preempt the operational primary role back to Switch-A? (Choose two.)
A.
Configure the local vPC role priority to have a lower value than Switch-A.
B.
Configure the local vPC role priority to have a higher value than Switch-A.
C.
Disable and then re-enable the vPC peer-keepalive link.
D.
Configure the local vPC role priority to have the same value as Switch-A.
E.
Disable and then re-enable the vPC peer link.