Refer to the exhibit.

Refer to the exhibit. A network engineer is troubleshooting a Cisco Nexus 5000 Series Switch. The interface between the server and the switch is nonoperational and is expected to operate at 10 Gbps. The drain rate of the interface is 3 Mbps. Which action resolves the issue?

A.

Configure pause error-disable recovery

Answers
A.

Configure pause error-disable recovery

B.

Enable link level pause on the interface

Answers
B.

Enable link level pause on the interface

C.

Reset priority flow counters

Answers
C.

Reset priority flow counters

D.

Set priority flow control pause

Answers
D.

Set priority flow control pause

Suggested answer: A

Explanation:

Reference:

https://www.cisco.com/c/en/us/td/docs/switches/datacenter/nexus5000/sw/troubleshooting/guide/N5K_Troubleshooting_Guide/n5K_ts_fcoe.html