Refer to the exhibit.

A client configures an upgrade of its Cisco Nexus switches that are connected to the Cisco ACI controller, such that the switches are upgraded one at a time. After the upgrade is run, it is discovered that both Cisco Nexus switches were upgraded simultaneously. Which two actions ensure that the switches upgrade one at a time? (Choose two.)

A.

Configure the *Do not pause on failure and do not wait on cluster health" Run Mode

Answers
A.

Configure the *Do not pause on failure and do not wait on cluster health" Run Mode

B.

Choose the 'Pause upon upgrade failure" Run Mode

Answers
B.

Choose the 'Pause upon upgrade failure" Run Mode

C.

Select the "Graceful Maintenance" checkbox

Answers
C.

Select the "Graceful Maintenance" checkbox

D.

Place each leaf switch in a different upgrade group

Answers
D.

Place each leaf switch in a different upgrade group

E.

Check the Ignore Compatibility" checkbox

Answers
E.

Check the Ignore Compatibility" checkbox

Suggested answer: C, D

Explanation:

Reference:

https://www.cisco.com/c/en/us/td/docs/unified_computing/ucs/ts/guide/UCSTroubleshooting/UCSTroubleshooting_chapter_0100.html